PROJECT OF UPGRADING AND EXPANDING PROVINCIAL WAY 15

An external centripetal route to the north, connect belt roads 2, 3 and 4 to Tay Ninh Province and related areas.

Project developer: Department of Transport
Address: 63 Ly Tu Trong Street, District 1, HCMC, Vietnam
Tel: (84-8) 829451 - 8292204, Fax: (84-8) 8290458
E-mail: sgtvt@tphcm.gov.vn
Website: www.sgtvt.hochiminhcity.gov.vn
Objective 
  • To make an external centripetal route to the north, connect belt roads 2, 3 and 4 to Tay Ninh Province and related areas.
  • To assist to load reduction of the existing centripetal national highways (13 and 22) and expressways with mass vehicle transport capacity.
  • To joint belt roads and centripetal provincial roads (12, 15, and 16) to be a roundabout system of external traffic routes.
Location: District 12, Hoc Mon District, Cu Chi District 
Scale: as sub-projects planned 
Investment capital: estimated at VND 2,740 billion (~US$ 171.25 million) 
Form of investment: BOT combined BT 
Priority level: 1 

Project.TP1: Road from east-north of Tan Chanh Hiep Ward to T-crossroad Bau 
Location: District 12 
Scale 
  • Length: 1,919m
  • Cross section area: 35m
  • Routing: from near T-crossroad Bau to near Quang Trung overpass bridge (intersection of east-north of Tan Chanh Hiep District, behind Quang Trung Software City)
Project.TP2: Repair and upgrade Trinh Thi Mieng Road (new Provincial Way 15) 
Location: Hoc Mon District 
Scale 
  • Length: 6km
  • Cross section area: 35m
  • Routing: from T-crossroad Bau (intersection of To Ky) to Xang Bridge
Project.TP3: Road from Xang 2 Bridge to Ben Nay Bridge 
Location: Cu Chi District 
Scale 
  • Length: 11.9km
  • Cross section area: 35m
  • Routing: from Xang 2 Bridge to Ben Nay Bridge
  • Xang 2 Bridge:
  • Reinforced concrete bridge with symmetry type and flower parterre in between; it has 3 single spans; each span includes 14x2 prefabricated box girders with 20m long
  • Length: 67.2m
  • Design load: group of pedestrians: 3x10-3Mpa
  • Live load HL-93
  • Bridge clearance diagram: 2x14.1m
Project.TP4: from Ben Nay Bridge to Provincial way No.7 
Location: Cu Chi District 
Scale 
  • Length: 10.45km
  • Cross section area: 35m
  • Routing: from Ben Nay Bridge to Provincial way No.7
Project.TP5: Road from Provincial way No.7 to Ben Suc Bridge 
Location: Cu Chi District 
Scale 
  • Length: 10.58km
  • Cross section area: 35m
  • Routing: from Provincial way No.7 to Ben Suc Bridge