URBAN RAILWAY SYSTEM

Construction of a mass rapid transit system, which is safe and convenient, to ease traffic pressure of the City.

Project developer: Department of Transport
Address: 63 Ly Tu Trong Street, District 1, HCMC, Vietnam
Tel: (84-8) 829451 - 8292204, Fax: (84-8) 8290458
E-mailsgtvt@tphcm.gov.vn
Websitewww.sgtvt.hochiminhcity.gov.vn
Metro route No. 4 
Objective: Construction of a mass rapid transit system, which is safe and convenient, to ease traffic pressure along North-South direction through the central part of the City. 
Location: District 4, District 12 
Construction scale 
  • Routing: Ben Cat Bridge – Thong Nhat – Road 26/3 – Nguyen Oanh – Nguyen Kiem – Phan Dinh Phung – Hai Ba Trung – Ben Thanh market – Nguyen Thai Hoc – Khanh Hoi – Le Van Lương – Nguyen Van Linh
  • Total length: 16km
  • Proposed number of stations: 12
  • Technical standards: design standards and cars using world advanced technologies to be applicable.
Investment capital: estimated at VND16,600 billion (~US$1,038 million) 
Form of investment: PPP 
Priority level: 2 
  
Metro route No.5 
Objective: Construction of a mass rapid transit system, which is safe and convenient, to ease traffic pressure along East-West direction through the central part of the City. 
Location: Districts: 5, 8 11, Binh Thanh, Phu Nhuan, Tan Binh, 
Construction scale: 
  • Routing: Dien Bien Phu- Bach Dang- Phan Dang Luu - Hoang Van Thu - Ly Thuong Kiet - Phu Dong Thien Vuong - Can Giuoc bus station.
  • Total length: 17km
  • Proposed number of stations: 18
  • Technical standards: design standards and cars using world advanced technologies to be applicable.
Investment capital: estimated at VND24,480 billion (~US$1,530 million) 
Form of investment: PPP 
Priority level: 2 
  
Metro route No.6 
Objective: Construction of a mass rapid transit system which is safe and convenient, to solve traffic congestion along North-South West direction. 
Location: Tan Phu District, District 6 
Construction scale 
  • Routing: Au Co – Luy Ban Bich – Tan Hoa
  • Total length: 6km
  • Proposed number of stations: 7
  • Technical standards: design standards and cars using world advanced technologies to be applicable.
Investment capital: estimated at VND8,640 billion (~US$540 million) 
Form of investment: PPP 
Priority level: 2