SAIGON RIVER RIGHT COAST (THE REST)

Water overflow resistant (overflow due to floods from upstream, tidal etc.) and adapt to climate change and protect 1,600 hectares of urban land with a population of about 25,000 people in the Saigon River right coast from the Cau Ngang canal to Thu Thiem New Township. Renew the urban and protect environment to make conditions for socio- economic development, improving their material and spiritual needs.

1.Name of project: The Saigon River right coast (the rest) from Cau Ngang canal to the Thu Thiem New Township.

 

2. Project code: 7173380

 

3. Project owner/ Project managing office

3.1. Information

- Name: Steering Center of the Urban Flood Control Program Ho Chi Minh City. (Representatives of the investors: Project Management 1547)

- Address:                     10 Tran Nhat Duat street, Tan Dinh ward, dist 1, HCMC.

- Representative:            Mr. Nguyen Phuoc Thao – Director

- Telephone:                  08.35267497    Fax: 08.35265354

- Website:                     http://ttcn.hochiminhcity.gov.vn/web/guest

3.2. Scope of activities / functions: On behalf of and assist People’s Committees of Ho Chi Minh City in owning and managing water systems and wastewater treatment plant the city.

3.3. Contact

-Contact person:      Mrs. Nguyen Thanh Phuong – Vice Director – Project Managing Board 1547.

-Telephone:             0988159769

- E-mail:                  phuong7416@gmail.com

 

4.Project objective

- Water overflow resistant (overflow due to floods from upstream, tidal etc.) and adapt to climate change and protect 1,600 hectares of urban land with a population of about 25,000 people in the Saigon River right coast from the Cau Ngang canal to Thu Thiem New Township

- Combined with renew the urban and protect environment to make conditions for socio- economic development, improving their material and spiritual needs of people

 

5.Investment form: combination between State fund and FDI business and local investors.

 

6.Investment scale

6.1.Estimated            Investment            capital: 992,756,112,000 VND

6.2. Used land square: 30,242 m2

6.3. Electricity need: electricity for lighting along the dike.

6.4. Water need: water for trees along the dike.

6.5. Labor need: labor for project.

 

7.  Project duration

7.1 Operation duration: permanent

7.2 Estimate time to operate: 2015

7.3 Plan/duration: 2011 – 2014

 

8.Looking for foreign partner

•Specific requirements for foreign partners: None

•Requirements for new forms of collaboration (financing,  transfer  of  technology  cooperation on technology and venture capital contribution or share purchase; or market supply ...): capital sponsor

 

9. Project location

9.1. Location: diat 2, Thu Duc dist.

-Specific location: From Cau Ngang canal to the Thu Duc Power Plant (Thu Duc district) and from Rach Chiec to the Thu Thiem New Urban Area (District 2).

-Related area: far from Tan Son Nhat airport 15 km; from Dong Nai Port 17 km; close the Hanoi Highway, East-West Highway.

9.2. Land status:

Land Type: Residential land

Clearance status: Difficult

Clearance costs: 170,934,179,000 VND. Land rent: no.

Land taxes and other costs associated with: no.

9.3.Electricity

-The situation of power supply are favorable

-Electricity prices: According to state regulations.

9.4. Water

-The situation of water supply are favorable

-Water prices: According to state regulations

9.5.Telecommunication service

-The existing services: Telephone, fax, postal and internet.

-Price: According to state regulations, the market.

9.6.Transportation:

-Status: favorable.

-Major transport: motor vehicles will waterway and road.

-Travel expenses / Cargo: According to the mark market price.

 

10. Market analysis: (Effect of the project)

-Contributing to overcome the phenomenon of flooding in the region and the phenomenon of erosion, protect riparian areas.

-Creating a space riparian area cool, clean, is the resting place of entertainment, walk and relax after the day labor.

-Economic efficiency: The project will certainly bring economic benefits but these benefits only through an indirect way shown in the following issues: Reduce flooding, reduce congestion due to flooding, as increased land values as well as real estate in the region, investment etc.