Back

PROJECTS ON URBAN RAILWAY SYSTEM

Urban railways system

1. METRO LINE NO. 2 (THU THIEM – TAY NINH BUS INTERCHANGE)

-           Alignment: Tay Ninh Bus Interchange – Truong Chinh – Tham Luong – Cach Mang Thang Tam – Ben Thanh – Thu Thiem.

-           Total length: 19 km, first point at Thu Thiem and last point at Tay Ninh Bus Interchange.

-           Project is separated into 2 stages:

+ Stage 1 (Ben Thanh – Tham Luong) The project had donor.

+ Stage 2 (Ben Thanh – Thu Thiem and Tham Luong – Tay Ninh Bus Interchange) Total length of 2 sections is 8.5 km.

Through  districts 1, 2, 12, Tan Binh.

-           The stage 2 project would be invested by ODA, BOT…

 

2. METRO LINE NO. 3A (BEN THANH – TAN KIEN)

-           Alignment: Ben Thanh (at Quach Thi Trang square) – Pham Ngu Lao – Cong Hoa Roundabout – Hung Vuong – Hong Bang – Kinh Duong Vuong – Western Bus Interchange – Tan Kien.

-           Total length: 16.2 km.

-           Number of station: 11 underground stations.

-           Tan Kien depot  at Binh Chanh district with area of 25 ha.

-           Through  districts: 1, 3, 5, 6, 10, 11, Binh Tan, Binh Chanh.

-           Project is separated into 2 stages:

+ Stage 1(Ben Thanh – Western Bus Interchange) Total length: 9.7 km underground.

Total investment cost (estimated): US$1.5 billion.

+ Stage 2 (Western Bus Interchange – Tan Kien) and Tan Kien depot

Total length: 6.5 km.

-           Total investment cost (estimated): US$600 million.

-           The metro line No. 3a project would be invested by ODA, BOT…

 

3. METRO LINE NO. 3B (CONG HOA ROUNDABOUT – HIEP BINH PHUOC)

-           Alignment: Cong Hoa Roundabout – Nguyen Thi Minh Khai – Xo Viet Nghe Tinh – Highway 13rd – Hiep Binh Phuoc.

-           Total length: 12.1 km (9.1 km underground and 3 km elevated).

-           Number of station: 10 (8 underground stations and 2 elevated stations).

-           Through  districts: 1, 3, 5, Binh Thanh and Thu Duc.

-           Total investment cost (estimated): US$1.2 billion.

-           The metro line No. 3b project would be invested by ODA, BOT…

 

4. METRO LINE NO. 4 (THANH XUAN – NGUYEN VAN LINH)

-           Alignment: Thanh Xuan (District 12) – Ha Huy Giap – Nguyen Oanh – Nguyen Kiem – Phan Dinh Phung – Hai Ba Trung – Ben Thanh – Nguyen Thai Hoc – Hoang Dieu – Nguyen Huu Tho – Nguyen Van Linh.

-           Total length: 24 km (The Metro line No.4 is waiting for approval from high authority to extend 14km more).

-           Number of station: 20 (15 underground stations, 4 elevated stations and 1 ground station).

-           Depot at Thanh Xuan ward, district 12 with area of 25 ha.

-           Go through  districts: 1, 3, 4, 7, 12, Go Vap, Tan Binh, Phu Nhuan and Nha Be.

-           Total investment cost (estimated): US$2.5 billion.

-           The metro line No. 4 project would be invested by ODA, BOT…

 

5. METRO LINE NO. 5 (SAI GON BRIGDE – NEW CAN GIUOC INTERCHANGE)

-           Alignment: New Can Giuoc Bus Interchange – Highway 50th – Tung Thien Vuong

– Ly Thuong Kiet – Hoang Van Thu – Phan Dang Luu – Bach Dang – Dien Bien Phu – Sai Gon Brigde.

-           Total length: 26.3 km including 15.6 km underground, 7.1 km elevated and then 3 km underground (connected to Tan Son Nhat international airport).

-           Number of station: 23 (16 underground stations, 7 elevated stations and 1 station at airport section).

-           Go through  districts: 8, 5, 10, 11, Binh Thanh, Tan Binh, Phu Nhuan and Binh Chanh.

-           The project is separated into 2 stages:

a)         Stage 1 (Bay Hien Roundabout – Sai Gon Brigde) The project had donor.

b)         Stage 2 (Bay Hien Roundabout – New Can Giuoc Bus Interchange) Total length: 14.8 km (7.4 km underground and 7.4 km elevated). Depot at Da Phuoc – Binh Chanh district with area of 20 ha.

Total investment cost (estimated): US$1.1 billion.

-           The stage 2 project would be invested by ODA, BOT…

 

6. METRO LINE NO. 6 (BA QUEO – PHU LAM ROUNDABOUT)

-           Alignment: Truong Chinh – Au Co – Luy Ban Bich – Tan Hoa – Phu Lam Roundabout.

-           Total length: 6.7 km underground.

-           Number of station: 7 underground stations.

-           Sharing Tham Luong depot  with metro line No.2.

-           Go through  districts: 6, 11, Tan Binh, Tan Phu.

-           Total investment cost (estimated): US$600 million.

-           The metro line No. 6 project would be invested by ODA, BOT…

 

7. TRAMWAY NO.1 (SAIGON – CHOLON – WESTERN BUS INTERCHANGE)

-           Alignment: Ton Duc Thang – Dong Tay Avenue – Ly Chieu Hoang – Western Bus Interchange.

-           Total length: 12.2 km go on the ground.

-           Depot at Western Bus Interchange with area of 2.1 ha.

-           Go through  districts: 1, 5, 6, Binh Tan.

-           Total investment cost (estimated): US$250 million.

-           The tramway line No. 6 project would be invested by ODA, BOT…

 

8. MONORAIL NO. 2     (NGUYEN VAN LINH FROM HIGHWAY 50– DISTRICT 2)

-           Alignment: Highway 50th – Nguyen Van Linh – Thu Thiem new urban area.

-           Total length: 14 km.

-           Depot at Binh Chanh district with area of 5 ha.

-           Go through  districts: 2, 7, Binh Chanh.

-           Total investment cost (estimated): US$350 million.

-           The monorail line No. 2 project would be invested by ODA, BOT…

 

9. MONORAIL NO. 3 (GO VAP ROUNDABOUT – QUANG TRUNG SOFTWARE PARK – TAN THOI HIEP STATION)

-           Alignment: Go Vap Roundabout – Quang Trung Software Park – Tan Thoi Hiep station).

-           Total length: 8.5 km.

-           Depot at Tan Thoi Hiep ward, district 12 with area of 3 ha.

-           Go through  districts: 12, Go Vap.

-           Total investment cost (estimated): US$200 million.

-           The monorail line No. 3 project would be invested by ODA, BOT…

 

* ADDITIONAL INFORMATION

-           Objective: Constructing transport infrastructure of Mass Rapid Transport in order to reduce traffic jam in the city.

-           Preferential policy:

+ Law on investment No.59/2005/QH11 dated on 29/11/2005,

+ Decree No.108/2006/NĐ-CP dated on 22/9/2006,

+ Decree No.108/2009/ND-CP dated on 27/11/2009,

+ Decree No.131/2006/NĐ-CP dated on 09/11/2006…

 

Contact information

Management Authority for Urban Railways

Address : 29 Le Quy Don Street, Ward 7, District 3, Ho Chi Minh City

Tel         : (08)3930.9495 - (08)3930.9496

Fax        : (08)3930.9497 - (08)3930.9498

Email: ipdpi@hcm.vnn.vn