PROJECTS IN DISTRICT 8
Projects in District 8 include building apartments and residental areas such as the apartment block in Ruot Ngua Canal etc.; building kindergarten, primary and secondary school condominium in Ward 4; renovating Pham The Hien Condominium and building Pham The Hien Trade center etc. |
Project 27: Building a new Ruot Ngua Canal apartment block Location: Ward 16, District 8 Total investment area: 44,359sqm Objective: building new residential apartment block, improving infrastructure Project Developer: People’s Committee of Dist. 8 Additional information: The land-using score is 6.5, the average height is 16.3 and the total building floor is 288,334sqm. The estimated number of apartments (80m2/flat) is 2,218 apartments. The estimated total invest- ment capital is 2,395.386 billion VND, in which 266.154 billion VND is the value of compensation. 7 km from the city center. 210 houses which are located adjacent to Dong Tay Avenue need to be relocated
Project 28: Apartments in Ward 13, Dist. 8 Location: Ward 16, Dist.8 Total investment area: 95,000sqm Objective: building a new residential area and houses for low-income earners and re-settlement; 2,218 apartments. Form of investment: local direct investment Project Developer: People’s Committee of District 8 Investment capital: VND 2,395 billion
Project 29: U Cay Canal Apartment Building Location: Cay U Canal, Dist.8 Total investment area: 44,359sqm Objective: improving Cay U Canal and building a new apartment building Form of investment: local direct investment Project Developer: People’s Committee of District 8
Project 30: Project at the end of Ta Quang Buu Street Location: Ward 6, District 8 Scale of project: 8,230 m2 Objective: Developing urban area and constructing high buildings. The land-using score is 6.5, the average height is 16.3 and the total building floor is 53,495 m2. The estimated number of apartments (80m2/flat) is 412. The esti- mated total investment capital is 518,490 million, in which 123,450 million is the value of compensation Total Investment: VND 518,490 billion Additional information: 4km far from the city center. 117 houses which are located adjacent to the Ta Quang Buu St. have to be relocated. Form of investment: domestic capital. Project management units: People’s Committee of District 8.
Project 31: Project located at the South of Belt 2 Location: Ward 7, District 8 Scale of project: 25,000 m2 Objective: Resettling and constructing high buildings. The land-using score is 6.5, the average height is 16.3 and the total building floor is 162,500 m2. The estimated number of apartments (80m2/flat) is 1,250. The estimated total investment capital is VND 1,350 billion, in which 150 billion is the value of compensation Total Investment: VND 1,350 billion Additional information: 5m km far from the city center. Currently, 71 houses which are located adjacent to the Perimeter Road No. 2 need to be relocated. Half of this area is agricultural land. Form of investment: domestic capi- tal. Project management units: People’s Committee of District 8.
Project 32: Project Vuon Chuoi Area Ward 14 Location: Ward 14, District 8 Scale of project: 6,700 m2 Objective: Developing urban area and constructing high buildings. The land-using score is 6.5, the average height is 16.3 and the total building floor is 43.550 m2. The estimated number of apartments (80m2/flat) is 335. The esti- mated total investment capital is 415.400 million, in which 93.800 million is the value of compensation. Total Investment: VND415.400 billion Additional information: 4m km far from the city center. Currently, 48 houses which are located adjacent to Ben Binh Dong Street need to be relocated. Type of investment: domestic capital. Project management units: People’s Committee of District 8.
Project 33: Project in the back yard of Van Nguyen Location: Ward 15, District 8 Scale of project: 53,830 m2 Objective: Developing urban area and constructing high buildings. The land-using score is 6.5, the average height is 16.3 and the total building floor is 349,895sqm. The estimated number of apartments (80sqm/flat) is 2,692. The estimated total investment capital is VND2,906.82 billion, in which VND322.98 billion is the value of compensation. Total Investment: VND2,906.82 billion Additional information: 7km from the city center. Currently, 403 houses which are located adjacent to Ben Binh Dong Street opposite to the East-West Highway in District 6 need to be relocated. Type of investment: domestic capital. Project Management Units: People’s Committee of District 8
Project 34: Building and enlarging apartment Binh Dong Location: Ward 13, District 8 Scale of project: 2,300 sqm Objective: Destroying Binh Dong apartment block and surrounding old buildings, constructing and expanding the apartment block expand for resettlement on the scene and resettlement for households relocated from the collective degradation in district 8. The rest are apartments for senior to take back capital. Scale construction: 16 floors and a basement for garage, land use coefficient 5.2, construction density of 40%, total 240 apartments (95 units for resettlement, 145 business units) Total Investment: VND 143.5 billion Additional information: 2 km far from city center. Current status including Binh Dong apartment (3 floors), proposed revocation and allocation from City People’s Committee and give warehouse land to Binh Dong 503 (2 floors) which has damaged along with 9 apartments. Location is adjacent to the Binh Dong St. opposite to East- West Highway in District 5. Plan may agree to increase the coefficient of land use and building height. Investment form: domestic social capital. Project Management units: People’s Committee of District 8.
Project 35: Xang Thoi area, Chu Y Bridge Location: Ward 1, District 8 Area: 91,540 sqm Objective: Developing urban area and constructing high buildings. The land-using score is 6.5, the average height is 16.3 and the total building floor is 595,010 m2. The estimated number of apartments (80m2/flat) is 3,433 apart- ments. The estimated total investment capital is 8,941,052 million VND, in which 2,235,263 million VND is the value of compensation. Total Investment: VND 8,941 billion Additional information: 1-2km from the city center. Currently, 1598 houses which are located adjacent to ward 1 in District 5 need to be moved. Project management unit: People’s Committee of District 8
Project 36: Condominium Ward 7 District 8 Location: south of Vanh Dai 2 Street, Ward 7, District 8 Area: 25,000 sqm Objective: For resettlement and business building condominiums purposes. The land-using score is 6.5, the average height is 16.3 and the total building floor is 162,500 m2. The estimated number of apartments (80m2/flat) is 1,250 apartments. The estimated total investment capital is VND 1,350 billion, in which VND 150 billion is the value of compensation. Investment capital: VND 1,350 billion Additional information: 5km from the city center. Currently, 71 houses which are located adjacent to Vanh Dai 2 Street need to be moved. Half the land is agricultural land. Project management unit: People’s Committee of District 8
Project 37: Kindergarten, primary and secondary school transformation Location: Ward 4, District 8 Area: 21,882 sqm Objective: To develop the urban area and construct condominium The land-using score is 6.5, the average height is 16.3 and the total building floor is 142,233 m2. The estimated number of apartments (80m2/flat) is 1094 apart- ments. The estimated total investment capital is VND 1,444.22 billion, in which VND 393.877 billion is the value of compensation. Investment capital: VND 1,444.22 billion Additional information: 3km from the city center. Currently, 316 houses which are located adjacent to Cao Lo street and Pham The Hien street need to be moved Project management unit: People’s Committee of District 8
Project 38: Area of ward 11 Location: Ward 11, District 8 Area: 122,000 sqm Objective: To develop the urban area and construct condominium. The land-using score is 7.5, the average height is 18.8 and the total building floor is 793,000 m2. The estimated number of apartments (80m2/flat) is 6100 apart- ments. The estimated total investment capital is VND 7,466.4 billion, in which VND 1,610.4 billion is the value of compensation. Investment capital: VND 7,466.4 billion Additional information: 2km from the city center. Currently, there are 1,082 houses to be moved
Project 39: Renovating Pham The Hien Condominium, building Pham The Hien Trade center Location: Ward 4, District 8 Area: 23,818 sqm Objective: To destroy Pham The Hien old condominium (4 floors includes 13 block A, B, C) for resettlement on the scene and replace the current Pham The Hien market with the trade center. These new apartments are for capital recovery purpose. Scale of construction: 18 - 34 floors, land use coefficient 6.16, construction density of 32.2%, total 1,124 apartments (448 for resettlement, 676 for sale). Population: 4,000 – 4,500 people. Investment capital: VND 1,397 billion Additional information: 3km from the city center. The condominium is adjacent to streets Pham The Hien, Huynh Thi Phung, Dong Ho and Dao Cam Moc. Currently, there are 484 existing apartments, 9,000 sqm public land to be withdrawn (governmental department of district 8 and school) and exchange land so as to relocate. Project developer: People’s Committee of District 8
Project 40: Building and expansions of Dinh Hoa and Ben Can Giuoc Location: Ward 11, district 8 Area: 1,540 sqm Objective: Abolished the buildings and the company headquarters nearby, expose into reside areas, combining services and commerce. Building structure: 12 levels and 1 storey for parking, land use ratio 4.2, building ratio 40%, total: 120 blocks. Investment capital: VND 72.7 billion Additional information: 2km from city center, near Cha Va bridge. Present status includes Đinh Hoa residential area (2 levels), Ben Can Giuoc (2 levels) and 8 independent houses. At the present, the land has high value in Dis- trict 8 (at the center of Xom Cui market).
Project Developer The People’s Committee of District 8 Address Number 4, 1011 Pham The Hien Street, Ward 5 District 8 Contact person: Vo Thi Hien, Deputy Chairman Tel: (84.8) 54314331 Fax: (84.8) 54311388 Email: q8@tphcm.gov.vn |