MUD TREATMENT AREA OF THU DUC WATER PLANT
1. Requirement and current conditions
1.1. Requirement and current conditions
- Requirement: guarantee to meet the hygene quality of waste water letting out directly to Suoi Cai complied with the current Vietnam Standard – to protect environment.
- Current conditions: having compensation plan for project land
1.2. Masterplan:
- Processing to do Investment plan report
1.3. Objective: to protect environment, to split mud during the treatment of clean water before letting out to the sewers.
- Collect and treat waste water of clean water treatment plants of the Thu Duc water plant area
- Current objective (Phase 1): Collect and treat waste water of the two plants: the existing Thu Duc water plant with clean treatment capacity of 750,000 m3/day and BOO Thu Duc water plant with clean treatment capacity of 300,000 m3/day (2008) as the above criteria.
1.4. Capacity, location, total area, construction items, land
- Estimated capacity: 1,300,000m³/day and increasing to 2,150,000 m3/day
- Location: Thu Duc district, HCMC.
- Total area: 10 ha
1.5. Technology & condition
- Processing to do Investment plan report
1.6. Total investment capital, form of investment, time of investment
- Total investment capital: VND200 billion
- Form of investment: ODA capital
- Time of investment: 2009 – 2011.
2. Procedures and contact
- Procedures of the project investment: doing Investment project Report for approval
- Contact: Saigon Water Corporation