1.         Requirement and current conditions

1.1. Requirement and current conditions

-          Requirement: guarantee to meet the hygene quality of waste water letting out directly to Suoi Cai complied with the current Vietnam Standard – to protect environment.

-           Current conditions: having compensation plan for project land

1.2. Masterplan:

-          Processing to do Investment plan report

1.3. Objective: to protect environment, to split mud during the treatment of clean water before letting out to the sewers.

-          Collect and treat waste water of clean water treatment plants of the Thu Duc water plant area

-          Current objective (Phase 1): Collect and treat waste water of the two plants: the existing Thu Duc water plant with clean treatment capacity of 750,000 m3/day and BOO Thu Duc water plant with clean treatment capacity of 300,000 m3/day (2008) as the above criteria.

1.4. Capacity, location, total area, construction items, land

-          Estimated capacity: 1,300,000m³/day and increasing to 2,150,000 m3/day

-          Location: Thu Duc district, HCMC.

-          Total area: 10 ha

1.5. Technology & condition

-          Processing to do Investment plan report         

1.6. Total investment capital, form of investment, time of investment

-            Total investment capital: VND200 billion

-            Form of investment: ODA capital

-            Time of investment: 2009 – 2011.

2.         Procedures and contact

-          Procedures of the project investment: doing Investment project Report for approval