Back

LY TU TRONG TECHNICAL COLLEGE HO CHI MINH CITY

Build up modern college with study areas, sport areas, practice areas, residential areas, service areas etc. in order to improve the quality of training human resources to serve for the city industrialization and modernization. Construction land of Ly Tu Trong College is about 6 km far away from the Cu Chi center district to the southwest.

1. Name of project: Branch of Ly Tu Trong Technical College Ho Chi Minh City in Cu Chi district.

 

2. Project Owner: Ly Tu Trong Technical College Ho Chi Minh City

 

3. Project management agency:

3.1.  Information  about  the  owner  /  project management agency:

- Name:                Ly Tu Trong Technical College Ho Chi Minh city

- Address:            390 Hoang Van Thu Street, Ward 4, Tan Binh Dist. Ho Chi Minh.

- Representative:   Mr. Do Ky Cong          - Position: Principle

- Phone:               08. 38441198

- Fax                    118 676 08:38

- E-mail:               lytutrong@lytc.edu.vn  - Website: www. lytc.edu.vn

3.2.  Scope  of  activities  /  functions:  career  - professional training.

3.3. Contact us to find out the project:

- Contact:             Luong Xuan Chinh - Position: Vice Principle.

- Tel:                    08. 38119873 - E-mail: lxchinh@lytc.edu.vn

 

4. Project objectives

Build up modern college with study areas, sport areas, practice areas, residential areas, service areas etc. in  order  to  improve  the  quality  of training human resources to serve for the city industrialization and modernization

 

5. Investment scale

- Estimated investment capital:

- Land use: 32.9 ha.

- Demand for electricity: 3000 KVA.

- Demand for water: 360 m3/day night.

- Demand for labor: 5170 people (administrator + teachers + students)

 

6. Location

Specific location: multi-commune Phuoc Vinh An

- Phu Hoa Dong - Pham Van Coi, Phu Hoa Dong Commune, Cu Chi District, Ho Chi Minh City. Construction land of Ly Tu Trong College is about 6 km far away from the Cu Chi center district to the southwest.

Proposed land to build the college is about 30 km to the south, far from Tan Son Nhat Airport about 23km to the south, about 4 km to the intersection of Highway Province 8 and 15, located on Cay Bai.

-The East meets: Cay Bai street (20m boundary)

-The West meets: fields and pastures

-The South meets: Rach Lang The

-The North meets: : fields and pastures

 

7. The state land

7.1.  Type  of  land:  mostly  agricultural  land  or pasture with less economic efficiency.

Statistics table of land use

Number Type of land        Area (ha)        Ratio %

1      Construction land     0,0924        0,27

2      Soil land                  0,8129        2,40

3      Garden land             1,8251        5,40

4      Agricultural land       30,1478      89,15

5      Transport land

        (land way)               0,3397        0,11

6      Water surface          0,5821        1,72

        TOTAL                    33,81          100,00

- Clearance status: no clearance.

- Land rental: no.

- The land taxes and other costs associated.

7.2. Electricity:

- The situation of power supply: having 22KV power line (existing) located across the Cay Bai street in the east of the land planning.

7.3. Water:

- The situation of water supply: Inside the land planning without drainage systems.

7.4. Communication services:

- The situation of providing communication information services: no.

7.5. Transportation:

- Status: having route Cay Bai street with 12m paved roadway in the east is the main way approaches to land planning

- There are 4-6m land routes exist clamp