EXPANDING THU DUC WATER PLANT - PHASE V
1. Requirement and current conditions 1.1. Requirement and current conditions - Requirement: based on Draft general plan of HCMC water supply until 2025 designed by VIWASE in May 2008 (the final report) - Current conditions: + It is possible to build the plant in the area of residential houses of staffs of Thu Duc Water Plant + Clean water pump station and raw water pump station built in phase 3 + to build a new clean water pump station with capacity of 500,000 m3/day + to build clean water tank with capacity of 300,000 m3/day + Having trouble in clearing security corridor of raw water and clean water pipe systems built from 1965 to serve for development projects + Difficult in clearing land to build D.2400 raw water transfer system from Hoa An to Thu Duc. 1.2. Masterplan: - Draft general plan of HCMC water supply until 2025 designed by VIWASE in May 2008 (the final report) 1.3. Objective: to supplement water system for HCMC 1.4. Capacity, location, total area, construction items, land - Estimated capacity: 500,000m³/day - Location: Thu Duc district, HCMC. - Total area : 2.5 ha 1.5. Technology & conditions + Technological system as same that of Thu Duc 3 Water Plant (lamenlla across deposit) + Construction in the area of Thu Duc Water Plant (clearing space of residential houses of Thu Duc Water Plant,…) 1.6. Total investment capital, form of investment, time of investment - Total investment capital: VND2,500 billion - Form of investment: J.V - Time of investment: 2020 – 2024. 2. Procedures and contact - Procedures of the project investment: doing Investment project Report for approval (Group A project) - Contact: Saigon Water Corporation |