Requirement and current conditions
1.1. Requirement and current conditions
- Requirement: based on draft general plan of HCMC water supply until 2025 designed by VIWASE in May 2008 (the final report)
- Current conditions:
+ It is possible to build the plant in the area of 1.5ha where to locate for Thu Duc water plant – phase 3 (enough land for building 4 units x 150,000 m3/day)
+ Clean water pump station and raw water pump station built in phase 3
+ No need to build clean water tank (using the existing one)
+ Having trouble in clearing security corridor of raw water and clean water pipe systems built from 1965 in order to serve for development projects
+ Difficult in clearing land to build D.2400 raw water transfer system from Hoa An to Thu Duc.
1.2. Masterplan
- Draft general plan of HCMC water supply until 2025 designed by VIWASE in May 2008 (the final report)
1.3. Objective: to supplement water system for HCMC
1.4. Capacity, location, total area, construction items, land
- Estimated capacity: 300,000m³/day
- Location: Thu Duc district, HCMC.
- Total area: 0.7 ha
1.5. Technology
+ Technological system as same that of Thu Duc 3 Water Plant (lamenlla across deposit)
+ Construction in the area of Thu Duc Water Plant (clean land)
1.6. Total investment capital, form of investment, time of investment
- Total investment capital: VND1,650 billion
- Form of investment: J.V
- Time of investment: 2011 – 2014.
- Procedures: doing Investment project Report for approval (Group A project)