Back

ELEVATED ROAD – ROUTE NO.3 (FROM ROUTE NO.2 AT TO HIEN THANH – LE HONG PHONG – LY THAI TO – NGUYEN VAN CU – NORTH-SOUTH AXIS – NGUYEN VAN LINH)

Build the elevated axis whose direction is from city center to the South of the city.

PROJECT TYPE                       Infrastructure – Bridge – Road

PROJECT NAME                     Elevated road – Route No.3 (from Route No.2 at To Hien Thanh – Le Hong Phong – Ly Thai To – Nguyen Van Cu 

                                             – North-South axis – Nguyen Van Linh)

LOCATION                              District 5, 7, 10

PROJECTED INVESTMENT       11,000 billion dong (518.87 million USD)

INVESTMENT TYPE                  BOT or BOT combined BT (preferred BOT)

OBJECTIVES                           Build the elevated axis whose direction is from city center to the South of the city.

GENERAL INFORMATION

Construction scale:

 + Entire length: 8.1 km

 + Width: 17.5 m

Decision No.631/QD-TTg of the Prime Minister: On the issuance of the national list of projects calling for foreign investment by 2020.

CONTACT AGENCY:

DEPARTMENT OF TRANSPORTATION  HO CHI MINH CITY

Address: 63 Ly Tu Trong Street, Ben Nghe, District 1, Ho Chi Minh city

Tel: 84.8.38290451