ELEVATED ROAD NO.2 (FROM JUNCTION WITH ROUTE NO.1 FOLLOWING TO HIEN THANH – LU GIA – BINH THOI – ROAD NO.3 TO RING ROAD 2)
Build the elevated axis whose direction is from city center to the West of the city |
PROJECT TYPE Infrastructure – Bridge – Road PROJECT NAME Elevated Road No.2 (from junction with Route No.1 following To Hien Thanh – Lu Gia – Binh Thoi – Road No.3 to Ring Road 2) LOCATION District 10, 11, District Binh Chanh PROJECTED INVESTMENT 21,483 billion dong (1,023 million USD) INVESTMENT TYPE BOT or BOT combined BT (preferred BOT) OBJECTIVES Build the elevated axis whose direction is from city center to the West of the city GENERAL INFORMATION Construction scale: + Entire length: 11.8 km + Width: 17.5 m Decision No.631/QD-TTg of the Prime Minister: On the issuance of the national list of projects calling for foreign investment by 2020. CONTACT AGENCY: DEPARTMENT OF TRANSPORTATION HO CHI MINH CITY Address: 63 Ly Tu Trong Street, Ben Nghe, District 1, Ho Chi Minh city Tel: 84.8.38290451 |