CONSTRUCTING HIGH LINE NO. 2

Sector : Infrastructure
Owner/Developer
    Name : Hồ Chí Minh City Department of Transportation and Communication
    Address : 63 Lý Tự Trọng, Bến Nghé Ward, District 1, Hồ Chí Minh City
    Telephone : 02838290451
    Fax : (84-8) 38.290.458
    Email : sgtvt@tphcm.gov.vn
    Website : sgtvt.hochiminhcity.gov.vn
    Contact person : Hồ Chí Minh City Department of Transportation and Communication
        Position : Hồ Chí Minh City Department of Transportation and Communication
        Email : sgtvt@tphcm.gov.vn
        Mobile : 02838290451
Location
    Image :

(No image has been uploaded yet)

    Address : District 10, District 11, Bình Chánh District
    City/Province : Ho Chi Minh
    District : 10
    Project scale : about 11,8 km
    Description : PROJECT OBJECTIVES Constructing a high-above radial axis from the central area toward the West of the city 
THE EXPECTED INVESTMENT CAPITAL VND 21,490 billion (equivalent to US$ 977 million) 
GENERAL INFORMATION ON THE PROJECT Under 
Decision no. 568/QD-TTg, the direction of the highway no. 2 is fixed as follows: crosses highway no. 1 at the interchange of Cha Cả Mausoleum, then goes along Bùi Thị Xuân road, cross Nhiêu Lộc - Thị Nghè Canal at bridge no. 5, goes along hamlet no. 656 Cách Mạng Tháng Tám, through Bắc Hải road - hamlet no. 2 Thiên Phước road - hamlet no. 654 Âu Cơ road - along Đầm Sen park - Bàu Trâu ditch, goes along Bàu Trâu ditch (border between District 6 and Tân Phú District), pass Phan Anh road and Tân Hòa Đông road to turn into Chiến Lược road, goes along Chiến Lược road to 
LOCATION District 5, District 7, District 10 TOTAL LENGTH about 8,1 km PROJECT OBJECTIVES Constructing a high-above radial axis from the central area toward the South of the city THE EXPECTED INVESTMENT CAPITAL VND 14,756 billion (equivalent to US$ 671 million) GENERAL INFORMATION ON THE PROJECT Under Decision No. 568/QD-TTg, the direction of the highway No. 3 is fixed as follows: from the interchange of the highway No. 2 at Thành Thái road, the highway goes along Thành Thái road, passes Tô Hiến Thành road. Then, continue going along Thành Thái road to Thành Thái intersection and 3 Thang 2 road, turns left into Lý Thái Tổ road to Lý Thái Tổ 7-intersection; from Lý Thái Tổ 7-intersection, the highway coincides with roads Lý Thái Tổ - Nguyễn Văn Cừ to Nguyễn Văn Cừ - Trần Hưng Đạo intersection. From Nguyễn Văn Cừ - Trần Hưng Đạo intersection, the highway goes along Nguyễn Văn Cừ for about 100m then turns left along Nguyễn Văn Cừ road, passes Võ Văn Kiệt avenue, Bến 
Mã Lò road before turning into Inter-village road no. 2 and ends at the interchange of NH 1 (Belt road no. 2). The Line No. 2 is about 11.8 km long, passing Districts 3, 6, 10, 11, Tân Bình, Bình Tân.
    Form of investment : Others