COMPONENT NO.5 PROJECT OF DRAINAGE AND POLLUTION TREATMENT AT THAM LUONG – BEN CAT – RACH NUOC LEN CHANNELS (PHASE 2)
Project of drainage and pollution treatment at Tham Luong – Ben Cat – Rach Nuoc Len channels (phase 2). Productivity: 150,000 m3/day night. Located at Tan Phu District. |
PROJECT TYPE Infrastructure – Water treatment
PROJECT NAME Project of drainage and pollution treatment at Tham Luong – Ben Cat – Rach Nuoc Len channels (phase 2). Component project No.5: West Saigon Waste water treatment plant
LOCATION District Tan Phu
PROJECTED INVESTMENT 1,650 billion dong (77.83 million USD)
INVESTMENT TYPE BOT or BT (prefered BOT)
OBJECTIVES Wastewater treatment at the west of Saigon
GENERAL INFORMATION Decision No.5754/QD-UBND dated 12/11/2012 of the People’s Committee on approving the list of BOT, BT projects calling for investment. Productivity: 150,000 m3/day night
CONTACT AGENCY: CENTER OF OPERATING THE CITY’S FLOOD FIGHTING PROGRAM Address: 10 Tran Nhat Duat, Tan Dinh ward, District 1, Ho Chi Minh City Tel: (84-8)3526.7497– (84-8)3526.7498 | FAX: (84-8) 3526.7497– (84.8) 3526.7498 |