COMPONENT NO.1 PROJECT OF DRAINAGE AND POLLUTION TREATMENT AT THAM LUONG – BEN CAT – RACH NUOC LEN CHANNELS (PHASE 2)
Improving water environment at Tham Luong – Ben Cat – Nuoc Len Canal. |
PROJECT TYPE Infrastructure – Water treatment
PROJECT NAME Project of drainage and pollution treatment at Tham Luong – Ben Cat – Rach Nuoc Len channels (phase 2). Component No.1 project: construct Canal embarkment and infrastructure on the banks of Tham Luong – Ben Cat – Nuoc Len Canal.
LOCATION District 8, 12 Go Vap, Binh Thanh, Tan Binh, Tan Phu, Binh Tan, District Hoc Mon, Binh Chanh
PROJECTED INVESTMENT 8,826 billion dong
INVESTMENT TYPE BT
OBJECTIVES Improving water environment at Tham Luong – Ben Cat – Nuoc Len Canal.
GENERAL INFORMATION Decision No.5754/QD-UBND dated 12/11/2012 of the People’s Committee on approving the list of BOT, BT projects calling for investment. Construction banks of 2 sides. Length: 32 km and park along the river.
CONTACT AGENCY: CENTER OF OPERATING THE CITY’S FLOOD FIGHTING PROGRAM Address: 10 Tran Nhat Duat, Tan Dinh ward, District 1, Ho Chi Minh City Tel: (84-8)3526.7497– (84-8)3526.7498 | FAX: (84-8) 3526.7497– (84.8) 3526.7498 |