BELT ROAD NO.4
Belt Road No.4 – Section 1
- Location: Cu Chi District
- Objectives: According to the Master plan, conduct investing and building the Belt Roads, transportation connection with other provinces and cities in the areas in order to release the pressure for inner-city transportation.
- Investment Capital: VND 5,900 billion
- Technical details: - Part 1: 15.8 km (from Phu Thuan bridge to Long An borders (ĐT 823, Hau Nghia )
- Cross-section plan: 10 lanes
- Investment form: BT, BOT in combination with BT, ODA or other appropriate form
Belt Road No.4 – Section 2
- Location: Nha Be district
- Objectives: According to the Master plan, conduct investing and building the Belt Roads, transportation connection with other provinces and cities in the areas in order to release the pressure for inner-city transportation.
- Investment Capital: VND 2,500 billion
- Technical details: Part 2: 6.18 Km (From Ranh Long An to Hiep Phuoc Industrial zone ).
- Cross-section plan: 10 lanes
- Investment form: BT, BOT in combination with BT, ODA or other appropriate form.
Contact info:
HCM City Department of Transport
63 Ly Tu Trong Street, District 1, Ho Chi Minh City, Vietnam
Tel: 84-8-3829 0451 - 823 7439 Fax: 84-8-3829 0458
Email: sgtcc@tphcm.gov.vn
Website: www.sgtvt.hochiminhcity.gov.vn